Bridge
Bridge Crossing Sungai Pulai and Link Road Projects, Johor, Malaysia
The project starts at JKR road from Tanjung Bin and ends at Jabatan Laut, Tanjung Pelepas. The project is 7.5km in length and is a two-way four-lane road with a designed speed of 90km/h and a bridge deck of 22.5m in width.
This project is an important bridge-link connecting Tanjung Bin to Tanjung Pelepas in Johor, Malaysia. When completed, the project will shorten the transportation of good and materials travelling time between Tanjung Bin and Tanjung Pelepas and will play an important role in promoting the development of Pontian, Kukup and the surrounding areas in Malaysia.
Construction and Completion of Bintulu-Jepak Bridge Crossing Kuala Kemena, Bintulu
The Bintulu-Jepak Bridge project is located in Bintulu, Sarawak, Malaysia. The cable-stayed bridge connects Jepak Site with Bintulu Town and the construction project is about 5km away from Bintulu Airport—Lepangan Terbang Bintulu.
The total length of the project is 3586.234 meters, including the bridge part of 1283.04m and road part of 2303.194m. The length of cable stay bridge is 484.4 meters long (main span 267.6m), that of approach and flyover is 788.84m.